Indian Railway Q. SCOR maintains ________ register when serious accident occurs. A. Chronological B. Logical C. Un-logical D. None of these Show Answer Answer Correct Answer : Chronological Discuss
Indian Railway Q. Second train during all communication failure shall be dispatched after an interval of A. 35 B. 20 C. 25 D. 30 Show Answer Answer Correct Answer : 30 Discuss
Indian Railway Q. Second train during TSL will be dispatched after ________. A. Both B. Line clear C. Without line clear D. None of these Show Answer Answer Correct Answer : Line clear Discuss
Indian Railway Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication. A. Station Traffic B. Movement of traffic C. None of Traffic D. None of these Show Answer Answer Correct Answer : Movement of traffic Discuss
Indian Railway Q. Section controller shall transmit the correct time at ________ hours daily to all the stations. A. 16 B. 20 C. 12 D. 10 Show Answer Answer Correct Answer : 16 Discuss
Indian Railway Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country? A. North Korea B. Japan C. South Korea D. China Show Answer Answer Correct Answer : Japan Discuss
Indian Railway Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition. A. Both B. Off C. On D. None of these Show Answer Answer Correct Answer : On Discuss
Indian Railway Q. Semi-automatic signal is identified by ________. A. Illuminated a marker B. Marker C. Semi marker D. None of these Show Answer Answer Correct Answer : Illuminated a marker Discuss
Indian Railway Q. Shatabdi Express train was started in ________. A. 1990 B. 1984 C. 1988 D. 1985 Show Answer Answer Correct Answer : 1988 Discuss
Indian Railway Q. Shunt signal is a ________ signal. A. Both B. Subsidiary C. Ordinary D. None of these Show Answer Answer Correct Answer : Subsidiary Discuss