More Questions on Indian Railway
- Q. Signals are treated as ________ if connected points become defective.
A)Both
B)Defective
C)Restricted
D)None of these
Answer: Defective
- Q. Speed of following tower wagon in the block section is ________ km/h.
A)8
B)5
C)2
D)4
Answer: 8
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
A)400 meters
B)270 meters
C)90 meters
D)None of these
Answer: 90 meters
- Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
A)5
B)3
C)4
D)6
Answer: 3
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. “Act” means the Railway Act is ________.
A)1989 (22 of 1989)
B)1989 (24 of 1989)
C)1989 (23 of 1989)
D)None of these
Answer: 1989 (24 of 1989)
- Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
A)25
B)75
C)15
D)30
Answer: 15
- Q. Station section available in which Class of Station?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: B-Class
- Q. In one train only system, information of lost of metal token is given to ________.
A)DRM
B)DOM
C)AOM
D)None of these
Answer: DRM
- Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
A)Rail Madad
B)Rail Sathi
C)Rail Dost
D)Rail Neer
Answer: Rail Madad
- Q. If a member disagrees with the reasons of the joint note of an accident, he may give
A)Both
B)Accident
C)Dissent
D)None of these
Answer: Dissent
- Q. Goods train without brake van shall not be run during ________.
A)CCF
B)BCF
C)ACF
D)None of these
Answer: ACF
- Q. What will be distance between fire affected train and rest of the train ?
A)50 meters
B)25 meters
C)45 meters
D)100 meters
Answer: 45 meters
- Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
A)15 kmph
B)20 kmph
C)Stop & Start
D)Normal speed
Answer: Normal speed
- Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
A)ALP
B)Driver
C)Guard
D)None of these
Answer: Guard
- Q. Loco pilot must have ________ sets of spectacles in his personal store.
A)Three
B)Two
C)One
D)None of these
Answer: Two
- Q. Maximum number of Explosive unit wagons in a goods
A)3
B)10
C)15
D)None of these
Answer: 10
- Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below:
A)1, 2, 3, 4 & 5
B)Only 2, 3 & 4
C)Only 2, 3, 4, 5
D)Only 2, 3 & 5
Answer: 1, 2, 3, 4 & 5
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State