Q. SCOR maintains ________ register when serious accident occurs.

Correct Answer

Chronological

More Questions on Indian Railway

  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
    A)Both
    B)GDR
    C)TDR
    D)None of these
    Answer: GDR
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. Weight required minimum for testing IC Apparatus is the
    A)7 - 10 kg
    B)6 kg
    C)10 kg
    D)None of these
    Answer: 7 - 10 kg
  • Q. The maximum distance covered by a patrol man should not normally exceed
    A)15 KM
    B)10 KM a day
    C)12 KM
    D)None of these
    Answer: 10 KM a day
  • Q. Which Zone is the largest railway zone in India?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Northern Railway
  • Q. The turning out time off BD SPL. During day is ________ minutes
    A)50
    B)30
    C)20
    D)None of these
    Answer: 30
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
    A)Habibganj railway station
    B)Farukhnagar railway station
    C)Safdarjung railway station
    D)Mumbai Central railway station
    Answer: Safdarjung railway station
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left
  • Q. In context with the Indian railways what is TPWS?
    A)Train Protection Warning Stopper
    B)Train Passenger Warning System
    C)Train Protection Warning System
    D)Transmission Protection warning Stopper
    Answer: Train Protection Warning System
  • Q. What was the main source of earning of Railway?
    A)Catering
    B)Goods fair
    C)Passenger fair
    D)None of thses
    Answer: Goods fair
  • Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
    A)Rajinder Sachar Committee
    B)Bibek Deberoy committee
    C)Rangarajan committee
    D)Mihir Shah Committee
    Answer: Bibek Deberoy committee
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
    A)T/369(B)
    B)T/369(3b)
    C)T/369(2b)
    D)None of these
    Answer: T/369(2b)
  • Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
    A)Maharashtra
    B)Tamil Nadu
    C)Himachal Pradesh
    D)Meghalaya
    Answer: Maharashtra
  • Q. Which state to have India’s first privately – run railway station?
    A)Kerala
    B)Tripura
    C)Odisha
    D)Madhya Pradesh
    Answer: Madhya Pradesh
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe

Leave a Comment