Indian Railway Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by A. T/369(1) B. T/369(3b) C. T/369(2) D. T/409 Show Answer Answer Correct Answer : T/409 Discuss
Indian Railway Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is A. 10 kmph B. 5 kmph C. 8 kmph D. None of these Show Answer Answer Correct Answer : 5 kmph Discuss
Indian Railway Q. When an accident occurs the GDR must their report to next SM in form. A. ACC5 B. ACC1 C. ACC2 D. ACC3 Show Answer Answer Correct Answer : ACC3 Discuss
Indian Railway Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle. A. Both B. Outer Most facing Points C. Inner Most facing signal D. None of these Show Answer Answer Correct Answer : Outer Most facing Points Discuss
Indian Railway Q. When baking a train from one line to the other line, it is necessary to present the train guard. A. Break van B. Point C. Station D. Any Place Show Answer Answer Correct Answer : Break van Discuss
Indian Railway Q. When did the first ignition engine develop? A. 1900 B. 1890 C. 1892 D. 1904 Show Answer Answer Correct Answer : 1892 Discuss
Indian Railway Q. when form T/D 912 is issued the driver shall not exceed the speed A. 25 kmph B. 15 kmph C. 20 kmph D. None of these Show Answer Answer Correct Answer : 25 kmph Discuss
Indian Railway Q. When four wheeler attached, speed of passenger train will be ________ km/h. A. 85 B. 80 C. 75 D. 90 Show Answer Answer Correct Answer : 75 Discuss
Indian Railway Q. When ISMD attached train is allowed to run through on PF line the speed must be A. 10 kmph B. 5 kmph C. 8 kmph D. None of these Show Answer Answer Correct Answer : 5 kmph Discuss
Indian Railway Q. When signal is not visible from minimum sighting distance, ________ signal is provided. A. Shunt B. Repeating C. Call-on D. None of these Show Answer Answer Correct Answer : Repeating Discuss