Q. When signal is not visible from minimum sighting distance, ________ signal is provided.

Correct Answer

Repeating

More Questions on Indian Railway

  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
    A)Both
    B)Off
    C)On
    D)None of these
    Answer: On
  • Q. Who has been appointed as the new Union Minister of Railways?
    A)Ashwini Vaishnaw
    B)Piyush Goyal
    C)Nirmala Sitharaman
    D)Mukhtar Abbas Naqvi
    Answer: Ashwini Vaishnaw
  • Q. To apply for Line block, the notice shall be given to DRM not less than
    A)12 hours
    B)48 hours
    C)24 hours
    D)None of these
    Answer: 24 hours
  • Q. Normally maximum gradient in station yards in BG is (at present)
    A)1 in 1000
    B)1 in 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. Kandaghat, a heritage railway station made entirely of wood and built by the British in 1903 was destroyed in the fire. In which state this Railway Station was located ?
    A)Himachal Pradesh
    B)Gujarat
    C)Maharastra
    D)Jammu & Kashmir
    Answer: Himachal Pradesh
  • Q. Joint sighting committee shall inspect the visibility of signals once in
    A)6 months
    B)A month
    C)3 months
    D)None of these
    Answer: 3 months
  • Q. How many minimum BP pressure is require in engine to charge Goods train?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
    A)3 man
    B)02 man
    C)04 man
    D)None of these
    Answer: 04 man
  • Q. Calling on signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. At least how far will the final detonator be used to defend the train in broad gauge?
    A)820 meters
    B)180 meters
    C)600 meters
    D)1220 meters
    Answer: 1220 meters
  • Q. ________ percent sub – quota for women under all reserved categories
    A)33
    B)30
    C)35
    D)40
    Answer: 33
  • Q. The speed of Engine on Baharline is ________ kmph
    A)16
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. When ISMD attached train is allowed to run through on PF line the speed must be
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Station Working Rules of Non-interlocked station is signed by ________.
    A)AOM & ADEN
    B)DOM & DEN
    C)Sr. DOM & Sr. DEN
    D)None of these
    Answer: Sr. DOM & Sr. DEN
  • Q. If the signal is continuously bobbing/flickering, the signal is treated as showing ________ aspect.
    A)Rectified
    B)Most Restrictive
    C)Restrictive
    D)None of these
    Answer: Most Restrictive
  • Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
    A)8 kmph
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: 15 kmph