Q. When four wheeler attached, speed of passenger train will be ________ km/h.

Correct Answer

75

More Questions on Indian Railway

  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)
  • Q. Fog signal man must be on ________ Hrs duty.
    A)5
    B)3
    C)4
    D)None of these
    Answer: 3
  • Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious
  • Q. Number of train signal register of single line is ________.
    A)T/166 B
    B)T/136 A
    C)T/137 B
    D)T/135
    Answer: T/137 B
  • Q. TSL is started between those two stations at which cross over facility are available and
    A)D Class/IBC
    B)A Class/IBS
    C)C Class/IBS
    D)None of these
    Answer: C Class/IBS
  • Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 4.8 kg/cm2 of BP pressure in the brake van.
    A)5
    B)4
    C)2
    D)8
    Answer: 5
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. The consumption of fuel during idle run per hour is
    A)25 Lts
    B)15 Lts
    C)20 Lts
    D)None of these
    Answer: 25 Lts
  • Q. Maximum speed of the train while unloading ballast is ________ km/h.
    A)6
    B)8
    C)4
    D)10
    Answer: 8
  • Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
    A)Both
    B)Off
    C)On
    D)None of these
    Answer: On
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. While protecting the material train, banner flag is placed at a distance of
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. DRM nominates ________ for each section to issue caution orders to train crew.
    A)Nil notice
    B)Caution notice station
    C)Notice
    D)None of these
    Answer: Caution notice station
  • Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
    A)Both 1 & 2
    B)Only 1
    C)Only 2
    D)Neither 1 nor 2
    Answer: Only 2
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. Colour of the semaphore repeating signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Caution order is carried forward at stations on Monday at ________ hours.
    A)12:00
    B)10:00
    C)11:00
    D)09:00
    Answer: 09:00