Indian Railway Q. Sounding of 4 hooters means ________. A. ART & MRV requirement at home Station B. ART C. MRV D. None of these Show Answer Answer Correct Answer : ART & MRV requirement at home Station Discuss
Indian Railway Q. Sounding of 5 hooters means ________. A. ART, MRV required at out station B. ART C. MRV D. None of these Show Answer Answer Correct Answer : ART, MRV required at out station Discuss
Indian Railway Q. Special instructions are issued by ________. A. Both B. COM C. Sr. DOM D. None of these Show Answer Answer Correct Answer : COM Discuss
Indian Railway Q. Special instructions are issued by whom? A. Authorized officer B. CCM C. CRS D. None of these Show Answer Answer Correct Answer : Authorized officer Discuss
Indian Railway Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking? A. 75 kmph B. 140 kmph C. 160 kmph D. 15 kmph Show Answer Answer Correct Answer : 15 kmph Discuss
Indian Railway Q. Speed of following tower wagon in the block section is ________ km/h. A. 8 B. 5 C. 2 D. 4 Show Answer Answer Correct Answer : 8 Discuss
Indian Railway Q. Speed of second train during temporary single line working is ________. A. Both B. Normal C. Abnormal D. None of these Show Answer Answer Correct Answer : Normal Discuss
Indian Railway Q. Speed of the following tower wagon is ________ km/h. A. 9 B. 10 C. 8 D. 4 Show Answer Answer Correct Answer : 8 Discuss
Indian Railway Q. Speed of the last train during ACF on double line is ________ km/h. A. 20/15/Walking B. 25/10/Walking C. 20/10/Walking D. None of these Show Answer Answer Correct Answer : 25/10/Walking Discuss
Indian Railway Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points. A. 30 B. 20 C. 25 D. 15 Show Answer Answer Correct Answer : 15 Discuss