More Questions on Indian Railway
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
A)Madhya Pradesh
B)Tamil Nadu
C)West Bengal
D)Punjab
Answer: West Bengal
- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
A)Warner, Home
B)Outer, Home
C)Distant, Home
D)Distant, Home, Starter
Answer: Distant, Home
- Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
A)Hand
B)Outer
C)Call-On
D)Non eof these
Answer: Outer
- Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
A)Received train
B)Train Divided
C)Thorugh train
D)None of these
Answer: Train Divided
- Q. The Ministry of Railways has recently launched which app for freight managers?
A)SNOORTI app
B)SFOORTI app
C)SKOORTI app
D)SMOORTI app
Answer: SFOORTI app
- Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
A)0-00
B)00-00
C)000-000
D)None of these
Answer: 00-00
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. 2 states of North East India will be connected through Broad Gauge. They are:
A)Meghalaya and Assam
B)Manipur and Meghalaya
C)Mizoram and Manipur
D)Mizoram and Arunachal Pradesh
Answer: Mizoram and Manipur
- Q. Signals are treated as ________ if connected points become defective.
A)Both
B)Defective
C)Restricted
D)None of these
Answer: Defective
- Q. DRM nominates ________ for each section to issue caution orders to train crew.
A)Nil notice
B)Caution notice station
C)Notice
D)None of these
Answer: Caution notice station
- Q. Signal failure advised to the driver through the station in rear will be inform
A)T/369(3b)
B)T/369
C)T/370
D)None of these
Answer: T/369
- Q. The minimum BP pressure is requiring on engine before continuity test is?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
A)6.8
B)7.8
C)5.8
D)4.8
Answer: 4.8
- Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
A)Central India Railway
B)Bombay Baroda Railway
C)The Scindia Railway
D)Great Indian Peninsula Railway
Answer: Great Indian Peninsula Railway
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State