More Questions on Indian Railway
- Q. The number of line clear ticket in up direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/B 1425
Answer: T/C 1425
- Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
A)--0
B)0-0
C)-0-
D)---
Answer: 0-0
- Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km
B)4300 Km
C)3700 Km
D)5298 km
Answer: 3700 Km
- Q. Metro Railway is functioning in which of the following Indian States?
A)West Bengal
B)Gujarat
C)Maharashtra
D)Tamil Nadu
Answer: West Bengal
- Q. Reminder Caution order number is ________.
A)T/C-408
B)T/B-409
C)T/A-409
D)None of these
Answer: T/B-409
- Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
A)3
B)6
C)4
D)2
Answer: 6
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. DRM nominates ________ for each section to issue caution orders to train crew.
A)Nil notice
B)Caution notice station
C)Notice
D)None of these
Answer: Caution notice station
- Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
A)0000-000
B)000000-0000 0
C)00000-0
D)0000-0000
Answer: 000000-0000 0
- Q. On which authority relief train shall be dispatched for obstructed block section?
A)On memo
B)PLCT
C)T/A602
D)None of these
Answer: T/A602
- Q. Warner signal is of ________ shape in TALQ signalling system.
A)Both
B)Fish Tailed
C)Long
D)None of these
Answer: Fish Tailed
- Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
A)RailSilver
B)RailSagar
C)RailCloud
D)RailBharat
Answer: RailCloud
- Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
A)15 minutes
B)10 minutes
C)5 minutes
D)No need
Answer: 15 minutes
- Q. Normally material train will work during ________.
A)Both
B)Day
C)Night
D)None of these
Answer: Day
- Q. Sounding of 4 hooters means ________.
A)ART & MRV requirement at home Station
B)ART
C)MRV
D)None of these
Answer: ART & MRV requirement at home Station
- Q. In double Distant signalling, outermost signal is called as ________.
A)Stop
B)Distant
C)Call-on
D)None of these
Answer: Distant
- Q. Validity of the competency certificate of the gateman is for ________ years.
A)9
B)10
C)3
D)4
Answer: 3
- Q. In which year Research, Design and Standard organization was established?
A)1959
B)1954
C)1957
D)1967
Answer: 1957
- Q. Shunting restrictions of station is written in ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: SWR
- Q. Sounding of 5 hooters means ________.
A)ART, MRV required at out station
B)ART
C)MRV
D)None of these
Answer: ART, MRV required at out station
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State