Q. Your train is first during TSL on double line.

Correct Answer

25 kmph

More Questions on Indian Railway

  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Shunt signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: First stop signal
  • Q. Between which place station section is situated at double class B station, equipped with MACLS?
    A)FP to LSS
    B)Home signal to Ad starter
    C)BSLB to Ad. Starter
    D)A or B any one
    Answer: BSLB to Ad. Starter
  • Q. If the block instrument becomes defective on a double line, ________ signal is also treated as defective.
    A)Stop signal
    B)Fisrt Stop signal
    C)Last stop signal
    D)None of these
    Answer: Last stop signal
  • Q. In one train only system, information of lost of metal token is given to ________.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. Matheran Hill Railway is located in which state of India?
    A)Odisha
    B)Himachal Pradesh
    C)Maharashtra
    D)Meghalaya
    Answer: Maharashtra
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. Warner signal is of ________ shape in TALQ signalling system.
    A)Both
    B)Fish Tailed
    C)Long
    D)None of these
    Answer: Fish Tailed
  • Q. How many training institutions of Railways are in India?
    A)Five
    B)Three
    C)Four
    D)Six
    Answer: Five
  • Q. There is insufficient vacuum/pressure in engine.
    A)_____00
    B)___0___
    C)0___0
    D)00-----
    Answer: 00-----
  • Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.
    A)Three Long
    B)One Long
    C)Two Long
    D)None of these
    Answer: One Long
  • Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
    A)1972
    B)1974
    C)1961
    D)1973
    Answer: 1972
  • Q. ________ brake is not provided in the coach of passenger train.
    A)Minor
    B)Hand
    C)Non-hand
    D)None of these
    Answer: Hand
  • Q. India’s first – ever railways disaster management centre will come up in which city?
    A)Lucknow
    B)Kolkata
    C)Bengaluru
    D)Pune
    Answer: Bengaluru
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. Normally material train will work during ________.
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day

Leave a Comment