- Q. Block competency certificate is given in the prescribed form ________.
A)T/115A
B)T/115B
C)T/115C
D)T/115D
Answer: T/115B
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
A)650
B)700
C)725
D)760
Answer: 760
- Q. What is the maximum speed of 140 ton diesel hydraulic crane?
A)140 kmph
B)75 kmph
C)100 kmph
D)160 kmph
Answer: 75 kmph
- Q. Where is the Indian Railways Institute of Mechanical and Electrical Engineering institute situated?
A)Jamalpur
B)Nasik
C)Baroda
D)Pune
Answer: Jamalpur
- Q. Goods train without brake van shall not be run during ________.
A)CCF
B)BCF
C)ACF
D)None of these
Answer: ACF
- Q. When water touches danger level mark, C.O. to be issued for speed – during day
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi
B)Hyderabad
C)Chennai
D)Kolkata
Answer: Hyderabad
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. The speed of shunting is ________.
A)10 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 15 kmph
- Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
A)45 meters beyond the obstruction
B)At 1st facing point of station
C)Facing point of concern line
D)No need
Answer: 45 meters beyond the obstruction
- Q. At station which signal will be taken off for block line?
A)Shut
B)Repeating
C)Calling on
D)No Signal
Answer: No Signal
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. Point indicator is provided to indicate ________.
A)Both
B)Points
C)Bar
D)None of these
Answer: Points
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. On which speed BG train should be run while speedometer failed in block section?
A)No need to reduced speed
B)10% less of sectional speed
C)10% less of booked speed
D)40 kmph
Answer: 10% less of sectional speed
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. In which year Research, Design and Standard organization was established?
A)1959
B)1954
C)1957
D)1967
Answer: 1957