More Questions on Indian Railway
- Q. Each motor coach shall consist of ________ Traction motors.
A)4
B)2
C)3
D)5
Answer: 4
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. IBS shows ________ light in normal condition.
A)Green
B)White
C)Red
D)Yellow
Answer: Red
- Q. What is the name of the first train of Indian Railways handed over to private players for operation?
A)Karnataka Express
B)Tejas Express
C)Shatabdi Express
D)Duronto Express
Answer: Tejas Express
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
A)Nil caution order
B)Caution order
C)Reminder order
D)None of these
Answer: Caution order
- Q. Signal that controls the entry of trains into the block section in advance is called as
A)Last Stop signal
B)Fisrt Stop signal
C)Stop signal
D)None of these
Answer: Last Stop signal
- Q. Staff of ________ department shall protect the material train while working in block section.
A)Engineering
B)Operation
C)C & W
D)None of these
Answer: Engineering
- Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
A)30
B)20
C)25
D)15
Answer: 15
- Q. Where did Chapman form the committee?
A)Edimbara
B)Glassgo
C)London
D)Lords
Answer: London
- Q. General rules may be modified by ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. The passenger bogies of the Indian Railways are manufactured at which of the following places?
A)Perambur
B)Kapurthala
C)Chittranjan
D)Bangalore
Answer: Perambur
- Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
A)1000 meters
B)400 meters
C)600 meters
D)None of these
Answer: 600 meters
- Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
A)Block sectiond
B)Next whole block section
C)Back whole block section
D)None of these
Answer: Next whole block section
- Q. What does the Slip siding protects?
A)Block Section
B)Station Section
C)Station Limit
D)Siding
Answer: Block Section
- Q. Material train is a ________ train.
A)Both
B)Departmental
C)Permanent
D)None of these
Answer: Departmental
- Q. At A class station, Neutral zone is the portion between starter and ________ signal.
A)Home signal
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
A)0000-000
B)000000-0000
C)00000-0
D)0000-0000
Answer: 000000-0000
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph