Q. While receiving train on an obstructed line and danger signal must be shown to LP at

Correct Answer

45 meters

More Questions on Indian Railway

  • Q. In which country was flange wheel invented?
    A)Europe
    B)Germany
    C)Japan
    D)Russia
    Answer: Germany
  • Q. Consider the following statements about the Railway Convention Committee: 1)It consists of members from Lok Sabha only 2)Chairman of Railway Convention Committee is appointed by Lok Sabha speaker Which among the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. S mark on the EMU coach means ________.
    A)Scroll
    B)Release
    C)Spare
    D)None of these
    Answer: Spare
  • Q. Guard of suburban train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)45
    C)30
    D)15
    Answer: 15
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)
  • Q. High flood level mark shall be painted in
    A)Blue
    B)Red
    C)White
    D)None of these
    Answer: Red
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. Presentation of the first ever railway budget in India held in
    A)1925
    B)1853
    C)1888
    D)1905
    Answer: 1925
  • Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
    A)TD-912
    B)TA-912
    C)TB-912
    D)TC-1425
    Answer: TA-912
  • Q. What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
    A)--0
    B)0-0
    C)-0-
    D)---
    Answer: 0-0
  • Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A
  • Q. For imposition of line block application must be sent ________ Hours in advance.
    A)18
    B)24
    C)12
    D)22
    Answer: 24
  • Q. Is general manager responsible for?
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board