- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red
- Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
A)3 man
B)02 man
C)04 man
D)None of these
Answer: 04 man
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph
B)140 kmph
C)160 kmph
D)15 kmph
Answer: 15 kmph
- Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
A)10
B)20
C)30
D)None of these
Answer: 10
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters
- Q. Signal sighting committee consists of TI, SI/PWI and ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
A)White light left and right
B)Green light up and down
C)Green light left and right
D)Green light without any movement
Answer: Green light left and right
- Q. If the points are set for main line, point indicator gives ________ light in the night.
A)Yellow
B)red
C)Green
D)White
Answer: White
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. LV board will be of ________ colour and with LV.
A)Yellow
B)Red
C)Green
D)None of these
Answer: Red
- Q. “C” class ODC is run with the permission of ________.
A)Head Quarter
B)DOM
C)CRS
D)None of these
Answer: CRS
- Q. Material train is a ________ train.
A)Both
B)Departmental
C)Permanent
D)None of these
Answer: Departmental
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters
- Q. While receiving train on an obstructed line and danger signal must be shown to LP at
A)40 meters from obstruction
B)45 meters
C)30 meters
D)None of these
Answer: 45 meters
- Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
A)Chittranjan
B)Varanasi
C)Perambur
D)Patiala
Answer: Chittranjan
- Q. Cycle trollies shall be treated as ________.
A)Motor Trolley
B)Push Trollies
C)Trolley
D)None of these
Answer: Push Trollies
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
A)Both
B)Lowest
C)Highest
D)None of these
Answer: Highest
- Q. The minimum BP pressure is requiring on engine before continuity test is?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2