More Questions on Indian Railway
- Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph
B)15 kmph
C)8 kmph
D)5 kmph
Answer: 8 kmph
- Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
A)43
B)41
C)42
D)45
Answer: 45
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. Between which of the destinations the first Indian train was started?
A)From Mumbai to Surat
B)From Kolkata to Delhi
C)From Mumbai to Thane
D)From Mumbai to Madras
Answer: From Mumbai to Thane
- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. Block competency certificate is issued by ________.
A)AOM
B)Principal ZRTI
C)SM
D)None of these
Answer: Principal ZRTI
- Q. Interchange point of Central and Western railway is ________.
A)Both
B)Dadar
C)Jalgaon
D)None of these
Answer: Both
- Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
A)In Break van
B)At Facing point
C)On Engine
D)At Anyplace
Answer: In Break van
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
A)8
B)3
C)5
D)10
Answer: 3
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. When was the Central Railway established?
A)14th April 1951
B)5th Nov 1951
C)14th Nov 1951
D)16th August, 1951
Answer: 5th Nov 1951
- Q. The turning out time off BD SPL. During day is ________ minutes
A)50
B)30
C)20
D)None of these
Answer: 30
- Q. Corridor block is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI
B)CI
C)LI
D)TI
Answer: PWI
- Q. The shuttle train service between Lahore and ________ railway station resumed its operation on 15 December after a gap of 22 years.
A)Amritsar
B)Wagah
C)Islamabad
D)Faridkot
Answer: Wagah
- Q. Number of train signal register of single line is ________.
A)T/166 B
B)T/136 A
C)T/137 B
D)T/135
Answer: T/137 B