Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.

Correct Answer

Next Examine

More Questions on Indian Railway

  • Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
    A)2 gangman
    B)JE(Pway)
    C)One gangman
    D)None of these
    Answer: JE(Pway)
  • Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
    A)Both 1 & 2 are correct
    B)Only 1 is correct
    C)Only 2 is correct
    D)Neither 1 nor 2 is correct
    Answer: Both 1 & 2 are correct
  • Q. Which of the following is the largest zone in terms of route kilometers?
    A)Northern Railways
    B)Western Railways
    C)Eastern Railways
    D)Southern Railways
    Answer: Northern Railways
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351
  • Q. General rules may be modified by ________.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. BSLB determines the limits of Station section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Which marker is available in repeating signal?
    A)P-Marker
    B)G-Marker
    C)C-Marker
    D)R-Marker
    Answer: R-Marker
  • Q. Modified lower quadrant signaling may be introduced only with section of
    A)GM
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
    A)CSO
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. Special instructions are issued by ________.
    A)Both
    B)COM
    C)Sr. DOM
    D)None of these
    Answer: COM
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. Not more than ________ persons including trollyman shall go on a trolly.
    A)9
    B)10
    C)3
    D)4
    Answer: 10
  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. During poor visibility the speed of lorry is
    A)5 kmph
    B)8 kmph
    C)15 kmph
    D)None of these
    Answer: 5 kmph