Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A
Any one
B
Non Tangible
C
Tangible
D
None of these
Correct Answer
Tangible
More Questions on Indian Railway
Q. Normally maximum gradient in station yards in BG is (at present)
A)1 in 1000 B)1 in 260 C)1 - 400 D)None of these
Answer: 1 - 400
Q. Height gauge is for the safety of ________.
A)Motor Trolley B)Trolley C)Ohe D)None of these
Answer: Ohe
Q. In which of the following cities is the National Rail Museum located ?
A)Hyderabad B)Mumbai C)New Delhi D)Chennai
Answer: New Delhi
Q. Shunt signal is a ________ signal.
A)Both B)Subsidiary C)Ordinary D)None of these
Answer: Subsidiary
Q. When was the construction work for the first Railway line Started?
A)1823 B)1821 C)1828 D)1830
Answer: 1821
Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3 B)Only 1 & 2 C)Only 2 & 3 D)1, 2 & 3
Answer: 1, 2 & 3
Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph B)15 kmph C)8 kmph D)5 kmph
Answer: 8 kmph
Q. The number of Train examination report is ________.
A)T/436 B)T/431 C)T/432 D)T/436
Answer: T/431
Q. Upto how many track machine shall be allowed for working within the block section?
A)8 B)2 C)5 D)10
Answer: 5
Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third B)First C)Second D)Fourth
Answer: Fourth
Q. Departmental enquiry must be ordered by ________.
A)DRM B)Sr. DPO C)COM D)Sr. DOM
Answer: DRM
Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
A)Rail Madad B)Rail Sathi C)Rail Dost D)Rail Neer
Answer: Rail Madad
Q. What will be maximum speed during shunting of goods train?
A)25 kmph B)8 kmph C)15 kmph D)30 kmph
Answer: 15 kmph
Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
A)50 B)50 C)40 D)60
Answer: 60
Q. Your train is first during TSL on double line.
A)25 kmph B)10 kmph C)15 kmph D)Normal speed
Answer: 25 kmph
Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km B)8 km C)10 km D)25 km
Answer: 25 km
Q. Where is the headquarters of Central Railway situated?
Q. ________ brake is not provided in the coach of passenger train.
A)Minor B)Hand C)Non-hand D)None of these
Answer: Hand
Q. Consider the following statements about the Railway Convention Committee: 1)It consists of members from Lok Sabha only 2)Chairman of Railway Convention Committee is appointed by Lok Sabha speaker Which among the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: 2 Only
Q. The form number of authority to proceed without line clear is ________.