Q. Which train in India has the longest route length?

Correct Answer

Kanyakumari - Dibrugarh Vivek Express

More Questions on Indian Railway

  • Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
    A)Rail Madad
    B)Rail Sathi
    C)Rail Dost
    D)Rail Neer
    Answer: Rail Madad
  • Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Nil caution order
    B)Caution order
    C)Reminder order
    D)None of these
    Answer: Caution order
  • Q. How many copies of caution order shall be prepared for a train provided with banking engine?
    A)5
    B)3
    C)4
    D)None of these
    Answer: 5
  • Q. It is a Python Rake.
    A)15 kmph
    B)60 kmph
    C)25 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. How many Class of Accident?
    A)20
    B)14
    C)16
    D)None of these
    Answer: 16
  • Q. Nil Caution order number is ________
    A)T/C409
    B)T/A-409
    C)T/B-409
    D)None of these
    Answer: T/A-409
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. Block overlap in multiple aspect signalling system is ________ meters.
    A)180
    B)200
    C)300
    D)208
    Answer: 180
  • Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
    A)Warner, Home
    B)Outer, Home
    C)Distant, Home
    D)Distant, Home, Starter
    Answer: Distant, Home
  • Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 4.8 kg/cm2 of BP pressure in the brake van.
    A)5
    B)4
    C)2
    D)8
    Answer: 5
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. when form T/D 912 is issued the driver shall not exceed the speed
    A)25 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Notice station notified in?
    A)SR
    B)SWR
    C)GR
    D)Working Time Table
    Answer: Working Time Table
  • Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
    A)TD-912
    B)TA-912
    C)TB-912
    D)TC-1425
    Answer: TA-912
  • Q. When ISMD attached train is allowed to run through on PF line the speed must be
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. During failure of signals and communications in DL automatic area the authority to proceed is
    A)T/B 912
    B)T/D 912
    C)T/A 912
    D)None of these
    Answer: T/B 912
  • Q. Which of the following two countries have largest electrified railway network in the world?
    A)Russia & China
    B)Russia & US
    C)US & China
    D)India & US
    Answer: Russia & China
  • Q. In how many zones Indian Railway has been divided?
    A)17
    B)14
    C)16
    D)20
    Answer: 17
  • Q. Point indicator is provided to indicate ________.
    A)Both
    B)Points
    C)Bar
    D)None of these
    Answer: Points
  • Q. The world’s highest railway bridge will come up over which Indian River?
    A)Ganga
    B)Narmada
    C)Godavari
    D)Chenab
    Answer: Chenab

Leave a Comment