Q. Which state has the longest route (in kilometers) of railway line in India?

Correct Answer

Uttar Pradesh

More Questions on Indian Railway

  • Q. Distant signal shows ________ light in normal condition in double distant signalling is provided.
    A)Three yellow
    B)One Yellow
    C)Two yellow
    D)Four yellow
    Answer: Two yellow
  • Q. Joint sighting committee shall inspect the visibility of signals once in
    A)6 months
    B)A month
    C)3 months
    D)None of these
    Answer: 3 months
  • Q. How many officers may be attached with light engine?
    A)1
    B)2
    C)3
    D)None of these
    Answer: 3
  • Q. The number of line clear ticket in down direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/D 1425
    Answer: T/D 1425
  • Q. During hand shunting only ________ Bogies can be hand shunted.
    A)3
    B)1
    C)2
    D)None of these
    Answer: 1
  • Q. Written authority received to pass approach stop signal.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. Maximum of ________ cranes can be attached in a passenger train.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph
  • Q. Distant signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Permissive
  • Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is
    A)Unrestricted
    B)75 kmph
    C)50 kmph
    D)None of these
    Answer: 75 kmph
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. Headquarters of which one among the following Railway Zones in India is situated at the highest elevation from the mean sea level?
    A)South Western Railway
    B)East Central Railway
    C)South Eastern Railway
    D)West Central Railway
    Answer: South Western Railway
  • Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
    A)T/C-912
    B)T/B-912
    C)T/D-912
    D)None of these
    Answer: T/D-912
  • Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
    A)Shimla
    B)Lucknow
    C)Chandigarh
    D)Siliguri
    Answer: Siliguri
  • Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)35
    C)30
    D)35
    Answer: 30
  • Q. At the starting station, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100