More Questions on Indian Railway
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. Notice station notified in?
A)SR
B)SWR
C)GR
D)Working Time Table
Answer: Working Time Table
- Q. During serious accident, ________ will be the in-charge of control office.
A)Sr. DOM
B)DOM
C)AOM
D)None of these
Answer: Sr. DOM
- Q. When an accident occurs the GDR must their report to next SM in form.
A)ACC5
B)ACC1
C)ACC2
D)ACC3
Answer: ACC3
- Q. Speed of the last train during ACF on double line is ________ km/h.
A)20/15/Walking
B)25/10/Walking
C)20/10/Walking
D)None of these
Answer: 25/10/Walking
- Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph
B)40 kmph
C)20 kmph
D)None of these
Answer: 40 kmph
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. Where is the Research, Design and Standard Organisation situated?
A)Pune
B)Lucknow
C)Bangalore
D)New Delhi
Answer: Lucknow
- Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on
B)Shunt signal
C)Private No.
D)None of these
Answer: Private No.
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Speed of train when whistle becomes defective is ________ km/h.
A)45/8
B)30/8
C)25/8
D)40/8
Answer: 25/8
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. What is the maximum speed of 140 ton diesel hydraulic crane?
A)140 kmph
B)75 kmph
C)100 kmph
D)160 kmph
Answer: 75 kmph
- Q. Maximum No. of ________ explosive wagons can be attached to a goods train.
A)6
B)5
C)4
D)10
Answer: 5
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. Where was the B.B.C.I locomotive started?
A)Boriville
B)Jamalpur
C)Parel
D)Hyderabad
Answer: Parel
- Q. Fly shunting will take place in
A)Flat Yard
B)Hump Yard
C)Gravity Yard
D)None of these
Answer: Hump Yard
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters