- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. If Goods Train catches fire ________ Must be preserved and sent to DCM.
A)Non-Samples
B)Samples & Seal Cards
C)Samples
D)None of these
Answer: Samples & Seal Cards
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. In which of the following cities is the National Rail Museum located ?
A)Hyderabad
B)Mumbai
C)New Delhi
D)Chennai
Answer: New Delhi
- Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4
B)ACC2
C)ACC3
D)None of these
Answer: ACC4
- Q. Form number of disconnection and reconnection is ________.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
A)T/A409
B)T/369(1)
C)T/409
D)No Need of any Authority
Answer: T/369(1)
- Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
A)One long
B)Three long
C)Short one long
D)None of these
Answer: Three long
- Q. Block competency certificate is given in the prescribed form ________.
A)T/115A
B)T/115B
C)T/115C
D)T/115D
Answer: T/115B
- Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
A)50 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 15 kmph
- Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
A)01 month
B)04 month
C)02 month
D)03 Months
Answer: 02 month
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
A)Both are true
B)Only 1 is true
C)Only 2 is true
D)Neither is true
Answer: Both are true
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
A)145
B)45
C)90
D)150
Answer: 45
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. What is the maximum speed of 140 ton diesel hydraulic crane?
A)140 kmph
B)75 kmph
C)100 kmph
D)160 kmph
Answer: 75 kmph
- Q. New Humsafar Express, 3 – tier AC train was flagged off between which two locations on 2 June 2018?
A)Agartala and Bengaluru
B)Ajmer and Rameshwaram
C)Gorakhpur and Anand Vihar
D)Jodhpur and Bandra
Answer: Jodhpur and Bandra