More Questions on Indian Railway
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
A)Receive on loop line
B)Run through from station
C)Receive of Main line
D)None of these
Answer: Run through from station
- Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third
B)First
C)Second
D)Fourth
Answer: Second
- Q. Block overlap in multiple aspect signalling system is ________ meters.
A)180
B)200
C)300
D)208
Answer: 180
- Q. Where is the Research, Design and Standard Organization situated?
A)Pune
B)Lucknow
C)Bangalore
D)New Delhi
Answer: Lucknow
- Q. When a goods train is working without brake can the speed is
A)25 kmph by day and 15 kmph by night
B)15 kmph
C)25 kmph
D)None of these
Answer: None of these
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. In double Distant signalling, outermost signal post is painted with ________.
A)Green & Yellow
B)White & yellow
C)Black & Yellow
D)None of these
Answer: Black & Yellow
- Q. Load infringing standard moving dimensions (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. Notice station caution order No. is ________
A)T/C-409
B)T/409
C)T/B-409
D)None of these
Answer: T/409
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. passing through station during day when running without brakevan and tail board.
A)25 kmph
B)10 kmph
C)20 kmph
D)Normal speed
Answer: 20 kmph
- Q. New Humsafar Express, 3 – tier AC train was flagged off between which two locations on 2 June 2018?
A)Agartala and Bengaluru
B)Ajmer and Rameshwaram
C)Gorakhpur and Anand Vihar
D)Jodhpur and Bandra
Answer: Jodhpur and Bandra
- Q. Tower wagon shall run as per the rules of working of ________.
A)Passengers
B)Wagon
C)Train
D)None of these
Answer: Train
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. Which of the following two countries have largest electrified railway network in the world?
A)Russia & China
B)Russia & US
C)US & China
D)India & US
Answer: Russia & China
- Q. Sounding of ________ hooters means accident of goods train at home station.
A)6
B)2
C)4
D)8
Answer: 2
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Sounding of 4 hooters means ________.
A)ART & MRV requirement at home Station
B)ART
C)MRV
D)None of these
Answer: ART & MRV requirement at home Station