More Questions on Indian Railway
- Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both
B)Path
C)Platform
D)None of these
Answer: Platform
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. For ‘B’ Class ISMD load, permission must be granted by
A)CE
B)DRM
C)CRS
D)None of these
Answer: CE
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 1
- Q. Which of the following has been adjudged as the cleanest railway station in category A1, as per recently released report by the Ministry of Railways?
A)Secunderabad
B)Vishakhapatnam
C)Jammu Tawi
D)Anand ViharTerminal
Answer: Vishakhapatnam
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. Wagon with livestock shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Where is the information about the Ruling Gradient of a section?
A)G & SR
B)SWR
C)WTT
D)Operating Manual
Answer: WTT
- Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
A)Only 1, 2 & 4
B)Only 1 & 2
C)Only 1, 2 & 3
D)1, 2, 3 & 4
Answer: Only 1, 2 & 4
- Q. What is the massage of 000 (three short) whistle sound by loco pilot?
A)Train parting
B)Signal Approaching
C)Train out of control
D)Unable to proceed
Answer: Train out of control
- Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
A)White light left and right
B)Green light up and down
C)Green light left and right
D)Green light without any movement
Answer: Green light left and right
- Q. The minimum BP pressure is requiring on engine before continuity test is?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
A)72
B)24
C)48
D)None of these
Answer: 72
- Q. The number of line clear ticket in up direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/B 1425
Answer: T/C 1425
- Q. New Humsafar Express, 3 – tier AC train was flagged off between which two locations on 2 June 2018?
A)Agartala and Bengaluru
B)Ajmer and Rameshwaram
C)Gorakhpur and Anand Vihar
D)Jodhpur and Bandra
Answer: Jodhpur and Bandra
- Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph