- Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
A)T/369(B)
B)T/369(3b)
C)T/369(2b)
D)None of these
Answer: T/369(2b)
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. When a goods train is working without brake can the speed is
A)25 kmph by day and 15 kmph by night
B)15 kmph
C)25 kmph
D)None of these
Answer: None of these
- Q. Number of the Nil caution order is ________.
A)T/C 410
B)T/A 409
C)T/B 408
D)None of these
Answer: T/A 409
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3
B)1 2 3 4
C)1 2 4 3
D)3 1 4 2
Answer: 4 2 1 3
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
A)400 meters
B)270 meters
C)90 meters
D)None of these
Answer: 90 meters
- Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: Last Stop signal
- Q. Guard of suburban train shall sign on ________ minutes before the actual departure of the train.
A)40
B)45
C)30
D)15
Answer: 15
- Q. Signal sighting committee shall submit its report on form ________.
A)T/101 B
B)T/103 B
C)T/102 B
D)None of these
Answer: T/102 B
- Q. Reference of ________ is written by the side of the Rule if the Rule is corrected.
A)No. and Item No. Correction Slip
B)Number Slip
C)Item Number
D)None of these
Answer: No. and Item No. Correction Slip
- Q. Train crew shall exchange alright hand signals upto ________ or last points.
A)Call-on
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. At which of the following places Diesel Component Works is established?
A)Perambur
B)Jamshedpur
C)Patiala
D)Varanasi
Answer: Patiala
- Q. Presentation of the first ever railway budget in India held in
A)1925
B)1853
C)1888
D)1905
Answer: 1925
- Q. The speed of Motor Trolly over points and crossings is
A)15 kmph
B)10 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. Where is the Railway Staff College located?
A)Vadodara
B)Pune
C)Delhi
D)Allahabad
Answer: Vadodara
- Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
A)50 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 15 kmph