More Questions on Indian Railway
- Q. How many members did the railway board had?
A)4
B)3
C)5
D)8
Answer: 4
- Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)
- Q. Speed of following tower wagon in the block section is ________ km/h.
A)8
B)5
C)2
D)4
Answer: 8
- Q. Information of caution notice stations is given in ________.
A)Both A or B
B)WTT
C)Working time table
D)None of these
Answer: Both A or B
- Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
A)5
B)3
C)4
D)6
Answer: 3
- Q. The railway station situated in the extreme south is
A)Kanyakumari
B)Chennai
C)Cochin
D)Trivandrum
Answer: Kanyakumari
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. Yearly coaching stock census is taken on ________.
A)31st January
B)31st December
C)31st October
D)31st March
Answer: 31st October
- Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
A)25 kmph
B)10 kmph
C)15 kmph
D)30 kmph
Answer: 10 kmph
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. Sounding of 5 hooters means ________.
A)ART, MRV required at out station
B)ART
C)MRV
D)None of these
Answer: ART, MRV required at out station
- Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
A)15 km
B)18 km
C)10 km
D)20 km
Answer: 15 km
- Q. When was the Central Railway established?
A)14th April 1951
B)5th Nov 1951
C)14th Nov 1951
D)16th August, 1951
Answer: 5th Nov 1951
- Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C
B)T/105B
C)T/106B
D)T/102B
Answer: T/102B
- Q. In which class overlapping section is found?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. Target time for ARME from double exit siding is?
A)45 minutes
B)20 minutes
C)30 minutes
D)60 minutes
Answer: 20 minutes
- Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 1
- Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
A)Train parting
B)Signal Approaching
C)Train out of control,
D)Unable to proceed, Guard protect the train in rear
Answer: Unable to proceed, Guard protect the train in rear
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20