Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A
Yellow
B
Red
C
Green
D
White
Correct Answer
Green
More Questions on Indian Railway
Q. Patrolman becoming overdue during night.
A)40 kmph B)10 kmph C)15 kmph D)Normal speed
Answer: 10 kmph
Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
A)10 B)15 C)20 D)25
Answer: 10
Q. What will be the speed of second train running on T/C 602?
A)25 kmph B)10 kmph C)15 kmph D)Normal speed
Answer: Normal speed
Q. During prolonged failure of signals in automatic section, ________ authority is issued.
A)T/C 912 B)T/B 912 C)T/D 912 D)T/A 912
Answer: T/D 912
Q. What is the maximum speed in block section during thick & foggy weather?
A)15 kmph B)30 kmph C)60 kmph D)Not to move
Answer: 60 kmph
Q. Joint sighting committee shall inspect the visibility of signals once in
A)6 months B)A month C)3 months D)None of these
Answer: 3 months
Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
A)0000-000 B)000000-0000 C)00000-0 D)0000-0000
Answer: 000000-0000
Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200 B)600 C)800 D)None of these
Answer: 600
Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
A)DOM B)AOM(G) C)AOM(Chg) D)None of these
Answer: AOM(G)
Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
A)15 B)10 C)20 D)40
Answer: 15
Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?