Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.

Correct Answer

10 kmph

More Questions on Indian Railway

  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
    A)Uttar Pradesh
    B)Odisha
    C)West Bengal
    D)Chhattisgarh
    Answer: Uttar Pradesh
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
    A)Save collision
    B)Violation of block rules
    C)Passingn danger signal
    D)All of above
    Answer: All of above
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. Signal passed at danger is treated as ________ accident.
    A)Indirection
    B)Indicative
    C)Direct
    D)None of these
    Answer: Indicative
  • Q. Fairy Queen, the world’s oldest steam locomotive in regular operation, plies between New Delhi and ________
    A)Kalka
    B)Shimla
    C)Alwar
    D)Gwalior
    Answer: Alwar
  • Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
    A)Walkie-Talkie
    B)Walkie
    C)VHF
    D)None of these
    Answer: Walkie-Talkie
  • Q. The world’s highest railway bridge will come up over which Indian River?
    A)Ganga
    B)Narmada
    C)Godavari
    D)Chenab
    Answer: Chenab
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
    A)20
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. There is insufficient vacuum/pressure in engine.
    A)_____00
    B)___0___
    C)0___0
    D)00-----
    Answer: 00-----
  • Q. The headquarters of North – Eastern railway is situated at
    A)Gorakhpur
    B)Mumbai (CST)
    C)Guwahati
    D)New Delhi
    Answer: Gorakhpur
  • Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
    A)Both
    B)Temporary Working Order.
    C)Permanent working order.
    D)None of these
    Answer: Temporary Working Order.
  • Q. What is the target time for ART during night hours?
    A)60 minutes
    B)30 minutes
    C)45 minutes
    D)20 minutes
    Answer: 45 minutes