Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is

Correct Answer

25 kmph

More Questions on Indian Railway

  • Q. In which year Indian Railway was nationalized?
    A)1952
    B)1947
    C)1951
    D)1955
    Answer: 1951
  • Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. For Block Back form ________ To be issued on DL.
    A)T/B-806+PN
    B)T/806+PN
    C)T/A806+PN
    D)None of these
    Answer: T/806+PN
  • Q. There are 8 appendices and ________ parts in SWR.
    A)10
    B)8
    C)4
    D)12
    Answer: 12
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. Target time for departing ART during day is 30 minutes and during night is ________ minutes.
    A)60
    B)40
    C)50
    D)45
    Answer: 45
  • Q. Headquarters of which one among the following Railway Zones in India is situated at the highest elevation from the mean sea level?
    A)South Western Railway
    B)East Central Railway
    C)South Eastern Railway
    D)West Central Railway
    Answer: South Western Railway
  • Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
    A)Two
    B)Four
    C)Three
    D)Any one
    Answer: Three
  • Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
    A)8 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Through which of the following group of states does the Konkan Railways run?
    A)Maharashtra - Karnataka - Kerala - Tamil Nadu
    B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
    C)Maharashtra - Karnataka - Goa
    D)Karnataka - Goa - Kerala - Tamil Nadu
    Answer: Maharashtra - Karnataka - Goa
  • Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
    A)ST 1-260
    B)ST 1-400
    C)1-400 or sleeper
    D)None of these
    Answer: 1-400 or sleeper
  • Q. In case of goods train without brake van, Guard is exempted from ________.
    A)Whistling
    B)ARS
    C)Tail Lamp
    D)None of these
    Answer: ARS
  • Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
    A)DOM
    B)ADRM/Sr.DSO/DSO
    C)Sr.DOM
    D)None of these
    Answer: ADRM/Sr.DSO/DSO
  • Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
    A)10
    B)20
    C)30
    D)None of these
    Answer: 10
  • Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
    A)15
    B)20
    C)25
    D)30
    Answer: 30
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
    A)Shunt
    B)Repeating
    C)Call-on
    D)None of these
    Answer: Repeating

Leave a Comment