Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph

Correct Answer

15

More Questions on Indian Railway

  • Q. Moped trolley / Scooter trolley treated as ________.
    A)Motor Trolley
    B)Push Trollies
    C)Trolley
    D)None of these
    Answer: Motor Trolley
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351
  • Q. Stop signal is to be passed in On position.
    A)T-806
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(3b)
  • Q. ________ percent sub – quota for women under all reserved categories
    A)33
    B)30
    C)35
    D)40
    Answer: 33
  • Q. Which of the following stations was formerly known as Victoria Terminus?
    A)Lokmanya Tilak Terminus
    B)Churchgate Railway Station
    C)Mumbai Central
    D)Chhatrapati Shivaji Terminus
    Answer: Chhatrapati Shivaji Terminus
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. The maximum speed of the assistance train to be sent on T/A 602
    A)30 kmph
    B)10 kmph
    C)15 kmph
    D)40 kmph
    Answer: 15 kmph
  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
    A)Both
    B)Red Light
    C)Green Light
    D)None of these
    Answer: Red Light
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. Where is the information about the Ruling Gradient of a section?
    A)G & SR
    B)SWR
    C)WTT
    D)Operating Manual
    Answer: WTT
  • Q. The wagon containing ISMD load shall be attached.
    A)In Middle
    B)In rear
    C)Next to Engine
    D)None of these
    Answer: Next to Engine
  • Q. Which state has the longest route (in kilometers) of railway line in India?
    A)Rajasthan
    B)Maharashtra
    C)Andhra Pradesh
    D)Uttar Pradesh
    Answer: Uttar Pradesh
  • Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
    A)Maharashtra
    B)Tamil Nadu
    C)Himachal Pradesh
    D)Meghalaya
    Answer: Maharashtra
  • Q. Shunting speed of 5 box wagons is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 2
  • Q. Which authority shall be received to proceed for obstructed block section due to an Accident?
    A)T/A 602
    B)T-1425
    C)T-369(3b)+P.No.
    D)Simple memo
    Answer: T/A 602
  • Q. The first locomotive which was manufactured in Chittaranjan on
    A)Sep - 1949
    B)Nov - 1950
    C)Oct - 1950
    D)Oct - 1954
    Answer: Nov - 1950
  • Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
    A)3
    B)6
    C)4
    D)2
    Answer: 6