Q. What is the target time for ART during night hours?

Correct Answer

45 minutes

More Questions on Indian Railway

  • Q. On which speed BG train should be run while speedometer failed in block section?
    A)No need to reduced speed
    B)10% less of sectional speed
    C)10% less of booked speed
    D)40 kmph
    Answer: 10% less of sectional speed
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. Through which of the following group of states does the Konkan Railways run?
    A)Maharashtra - Karnataka - Kerala - Tamil Nadu
    B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
    C)Maharashtra - Karnataka - Goa
    D)Karnataka - Goa - Kerala - Tamil Nadu
    Answer: Maharashtra - Karnataka - Goa
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. In case of ACP, Assistant Loco Pilot shall proceed towards the rear from ________ side.
    A)Back
    B)Left
    C)Right
    D)Noe of these
    Answer: Right
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. Which whistle code shall be used by loco pilot while Approach on W board.
    A)Three short
    B)Long continue
    C)Intermittent
    D)Three long
    Answer: Intermittent
  • Q. Repeating signal shows ________ light in ON condition.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
    A)200 meters
    B)100 meters
    C)150 meters
    D)None of these
    Answer: 100 meters
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. In the enroute, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)
  • Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
    A)Not more than two bogies or their equivalent
    B)Two Bogies
    C)04 four wheelers only
    D)None of these
    Answer: Not more than two bogies or their equivalent
  • Q. When the points are set for main line, point indicator shows white target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: White
  • Q. when form T/D 912 is issued the driver shall not exceed the speed
    A)25 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
    A)139
    B)144
    C)123
    D)119
    Answer: 139
  • Q. What is the means of EA in WTT?
    A)Extra recovery time
    B)Extra allowances
    C)Engineering allowances
    D)None of these
    Answer: Engineering allowances