Q. What is the speed of second train on double line section running on T/A602?

Correct Answer

8 kmph

More Questions on Indian Railway

  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. At A class station, Neutral zone is the portion between starter and ________ signal.
    A)Home signal
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. Where there is no TSR, station master shall make entries in ________.
    A)Mid section
    B)Station diary
    C)Diary
    D)None of these
    Answer: Station diary
  • Q. Visibility test object is placed at a distance of ________ meters from the station building.
    A)180
    B)108
    C)100M
    D)200
    Answer: 180
  • Q. Hand shunting of vehicles in gradients ________ is totally prohibited
    A)1 In 100 or steeper
    B)1 in 400 or Steeper
    C)1 in 200 or steeper
    D)None of these
    Answer: 1 in 400 or Steeper
  • Q. What is the maximum speed of shunting of a petrol tank wagon?
    A)2 kmph
    B)15 kmph
    C)8 kmph
    D)5 kmph
    Answer: 8 kmph
  • Q. Maximum number of Explosive unit wagons in a goods
    A)3
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.
    A)Executive
    B)Examine
    C)Next Examine
    D)None of these
    Answer: Next Examine
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
    A)10 kmph
    B)25 kmph
    C)15 kmph
    D)None of these
    Answer: 25 kmph
  • Q. For ‘B’ Class ISMD load, permission must be granted by
    A)CE
    B)DRM
    C)CRS
    D)None of these
    Answer: CE
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Sounding of 5 hooters means ________.
    A)ART, MRV required at out station
    B)ART
    C)MRV
    D)None of these
    Answer: ART, MRV required at out station
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. General Manger is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 20 kmph
  • Q. What action should be taken by LP while observed Abnormal jurk in Ist block section of IBS?
    A)If he failed to inform to SM, protection of the portion by Guard
    B)Inform to SM through IBP phone
    C)Check his train
    D)All of above
    Answer: All of above
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. If the advanced starter and IBS are defective, SM shall issue T/369(3b) authority with private number of ________ station to pass both advanced starter and IBS.
    A)Both
    B)Back
    C)Next
    D)None of these
    Answer: Next

Leave a Comment