Q. What is the speed of a train after normalized in OHE supply immediate after tripping?

Correct Answer

35/20 kmph

More Questions on Indian Railway

  • Q. When did the first ignition engine develop?
    A)1900
    B)1890
    C)1892
    D)1904
    Answer: 1892
  • Q. The headquarters of the South Central Railway zone is located in?
    A)Hyderabad
    B)Kolkata
    C)Secunderabad
    D)Gorakhpur
    Answer: Secunderabad
  • Q. Where is the Research, Design and Standard Organization situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. Yearly coaching stock census is taken on ________.
    A)31st January
    B)31st December
    C)31st October
    D)31st March
    Answer: 31st October
  • Q. Signal failure advised to the driver through the station in rear will be inform
    A)T/369(3b)
    B)T/369
    C)T/370
    D)None of these
    Answer: T/369
  • Q. Shunting speed of 5 box wagons is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 2
  • Q. Under approved special instructions, Distant signal can be placed along with the
    A)Both
    B)Last Stop
    C)First Stop
    D)None of these
    Answer: Last Stop
  • Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
    A)Only 1 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 1, 3 & 4
    Answer: Only 1
  • Q. While protecting the material train, banner flag is placed at a distance of
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
    A)25
    B)20
    C)15
    D)None of these
    Answer: 25
  • Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
    A)01 month
    B)04 month
    C)02 month
    D)03 Months
    Answer: 02 month
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. If the Distant signal of a Gate becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Nil caution order
    B)Caution order
    C)Reminder order
    D)None of these
    Answer: Caution order
  • Q. ________ is measured with the help of anemometer.
    A)Both
    B)Wind
    C)Velocity
    D)None of these
    Answer: Both
  • Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
    A)8
    B)3
    C)5
    D)10
    Answer: 3
  • Q. When the train catches fire, that carriage must be ________.
    A)Both
    B)Isolated
    C)Non-isolated
    D)None of these
    Answer: Isolated
  • Q. In automatic block system SL, the signal that can be dispensed with is
    A)Automatic Stop signal
    B)Home
    C)Starter
    D)None of these
    Answer: Automatic Stop signal
  • Q. When was the nationalization of Indian Railways done?
    A)1951
    B)1952
    C)1950
    D)1954
    Answer: 1950
  • Q. In one train only system, information of lost of metal token is given to ________.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM