- Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. If the driver does not receive all right signal from the guard, he must call by giving.
A)On long
B)Two sharp whistles
C)One long one short
D)None of these
Answer: Two sharp whistles
- Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
A)1500
B)1200
C)1000
D)1800
Answer: 1000
- Q. Shunting restrictions of station is written in ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: SWR
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section
B)Station diary
C)Diary
D)None of these
Answer: Station diary
- Q. Derailment will come under accident class ________.
A)C
B)A
C)B
D)D
Answer: D
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Q. Which of the following is the easternmost division of the Indian Railways?
A)Rangiya
B)Tinsukia
C)Lumding
D)Katihar
Answer: Tinsukia
- Q. When an accident occurs the GDR must their report to next SM in form.
A)ACC5
B)ACC1
C)ACC2
D)ACC3
Answer: ACC3
- Q. Normally material train will work during ________.
A)Both
B)Day
C)Night
D)None of these
Answer: Day
- Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10
B)25
C)20
D)None of these
Answer: 25
- Q. Maximum speed of B’ class ODC is ________ km/h.
A)60
B)50
C)40
D)75
Answer: 40
- Q. Authority to pass IBS has been issued from station in rear.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. All automatic stop signals will have ________ marker plate.
A)G
B)B
C)A
D)None of these
Answer: A
- Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
A)01 long
B)03 long
C)02 long
D)None of these
Answer: 03 long
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. Time taken by train running at MPS is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Minimum running time
- Q. Caution order is carried forward at stations on ________ at 09:00 hours.
A)Monday
B)Tueday
C)Sunday
D)None of these
Answer: Monday
- Q. Station Working Rules of Non-interlocked station is signed by ________.
A)AOM & ADEN
B)DOM & DEN
C)Sr. DOM & Sr. DEN
D)None of these
Answer: Sr. DOM & Sr. DEN