Q. What is the maximum speed of a goods train pushed backed from block section ?

Correct Answer

8 kmph

More Questions on Indian Railway

  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. Yearly coaching stock census is taken on ________.
    A)31st January
    B)31st December
    C)31st October
    D)31st March
    Answer: 31st October
  • Q. What is the normal aspect of an Automatic stop signal on double line Automatic section?
    A)DOUBLE YELLOW
    B)RED
    C)GREEN
    D)YELLOW
    Answer: GREEN
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these
  • Q. During power failure in automatic block section, on which authority relief engine will proceed?
    A)TC-912
    B)TA-912
    C)TB-912
    D)TD-912
    Answer: TC-912
  • Q. It is the responsibility of SM to see that shunting is performed as per ________.
    A)G&R
    B)WTT
    C)SWR
    D)None of these
    Answer: SWR
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. IN the BD Spl, the water must be filled ________.
    A)Three Week
    B)Once a week
    C)Two week
    D)None of these
    Answer: Once a week
  • Q. Matheran Hill Railway is located in which state of India?
    A)Odisha
    B)Himachal Pradesh
    C)Maharashtra
    D)Meghalaya
    Answer: Maharashtra
  • Q. Number of train signal register of single line is ________.
    A)T/166 B
    B)T/136 A
    C)T/137 B
    D)T/135
    Answer: T/137 B
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)30 kmph
    Answer: 10 kmph
  • Q. Load infringing standard moving dimensions (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. In which city is the Wheel and Axle Plant of the Indian Railways located?
    A)Bangalore
    B)Kapurthala
    C)Varanasi
    D)Rae Barelly
    Answer: Bangalore
  • Q. Sounding of 5 hooters means ________.
    A)ART, MRV required at out station
    B)ART
    C)MRV
    D)None of these
    Answer: ART, MRV required at out station
  • Q. Fog signal man must be on ________ Hrs duty.
    A)5
    B)3
    C)4
    D)None of these
    Answer: 3
  • Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
    A)2
    B)1.5
    C)1
    D)None of these
    Answer: 1.5
  • Q. The speed of the train over neutral section shall not be less than ________ kmph
    A)40
    B)20
    C)30
    D)None of these
    Answer: 30

Leave a Comment