Q. What is the massage of 000 (three short) whistle sound by loco pilot?

Correct Answer

Train out of control

More Questions on Indian Railway

  • Q. Where was the B.B.C.I locomotive started?
    A)Boriville
    B)Jamalpur
    C)Parel
    D)Hyderabad
    Answer: Parel
  • Q. Tank engine can run at ________ speed if cow catcher and head light during night is provided.
    A)50 kmph
    B)Booked
    C)Sectional
    D)None of these
    Answer: Sectional
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
    A)1500 meters
    B)200 meters
    C)1000 meters
    D)2000 meters
    Answer: 1000 meters
  • Q. In which year palace on wheels train inaugurated?
    A)1982
    B)1988
    C)1978
    D)1965
    Answer: 1982
  • Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
    A)Only 1 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 1, 3 & 4
    Answer: Only 1
  • Q. When the train is stopped at FSS for more than ________ minutes, the Driver must send his assistant to station after consulting with guard.
    A)10
    B)5
    C)7
    D)None of these
    Answer: 5
  • Q. Block section limit board provided at station?
    A)B class Single line TA
    B)B class Single line MAUQ
    C)B class Double line TA
    D)B class Double line MA
    Answer: B class Double line MA
  • Q. Who will be called Sahayak?
    A)Coolies
    B)New Superfast Train
    C)Upcoming Event made for Disabled Persons
    D)Railway Magazine (including Railway's upcoming ventures)
    Answer: Coolies
  • Q. While clearing the load with an invalid brake power certificate, if train examiner is not available, Loco Pilot and Guard shall ensure safety of the train and take the train upto ________.
    A)Executive
    B)Examine
    C)Next Examine
    D)None of these
    Answer: Next Examine
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)
  • Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
    A)Shaktimaan
    B)Surakhsha
    C)Rail Rakshak
    D)Rakshak
    Answer: Rakshak
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. India’s first – ever railways disaster management centre will come up in which city?
    A)Lucknow
    B)Kolkata
    C)Bengaluru
    D)Pune
    Answer: Bengaluru
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. What is the width of broad gauge railway line in India?
    A)4 feet 11 inches
    B)5 feet 3 inches
    C)5 feet 6 inches
    D)5 feet 4 inches
    Answer: 5 feet 6 inches
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. In double Distant signalling, outermost signal post is painted with ________.
    A)Green & Yellow
    B)White & yellow
    C)Black & Yellow
    D)None of these
    Answer: Black & Yellow

Leave a Comment