Q. What is the length of North-Eastern Frontier Railway (NFR)?

Correct Answer

3700 km

More Questions on Indian Railway

  • Q. “C” class ODC is run with the permission of ________.
    A)Head Quarter
    B)DOM
    C)CRS
    D)None of these
    Answer: CRS
  • Q. In which country was flange wheel invented?
    A)Europe
    B)Germany
    C)Japan
    D)Russia
    Answer: Germany
  • Q. Competency certificate of the gateman of interlocked engineering gate is issued by
    A)SSE/C & W
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: SSE/P.way
  • Q. General Manger is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. Time taken by train running at MPS is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Minimum running time
  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. On which speed BG train should be run while speedometer failed in block section?
    A)No need to reduced speed
    B)10% less of sectional speed
    C)10% less of booked speed
    D)40 kmph
    Answer: 10% less of sectional speed
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. Station limit is the portion between ________.
    A)Both
    B)Outermost signal
    C)Innermost signal
    D)None of these
    Answer: Outermost signal
  • Q. Calling on signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Subsidiary
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. For imposition of line block application must be sent ________ Hours in advance.
    A)18
    B)24
    C)12
    D)22
    Answer: 24
  • Q. Approved special instructions are issued by ________.
    A)PCOM
    B)CRS
    C)MT
    D)None of these
    Answer: CRS
  • Q. To start a train from unsignalled line ________ authority is issued.
    A)T/511
    B)T/512
    C)T/515
    D)T/521
    Answer: T/511
  • Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
    A)ACC4
    B)ACC2
    C)ACC3
    D)None of these
    Answer: ACC4
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
    A)3
    B)6
    C)4
    D)2
    Answer: 6
  • Q. In the enroute, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90

Leave a Comment