Q. Weight required minimum for testing IC Apparatus is the

Correct Answer

7 - 10 kg

More Questions on Indian Railway

  • Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
    A)Chittranjan
    B)Varanasi
    C)Perambur
    D)Patiala
    Answer: Chittranjan
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. The monies in the National Investment Fund can be used for ________: 1. Recapitalization of public sector banks 2. Purchasing the shares of CPSEs 3. Towards operating expenses of Indian Railways 4. Social Overheads such as building schools, toilets etc. Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1, 2 & 3
    C)Only 2, 3 & 4
    D)Only 1 & 2
    Answer: Only 1 & 2
  • Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. When a Train carrying passengers does not arrive within ________ minutes plus running time. The SM must take action.
    A)15
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
    A)2
    B)1.5
    C)1
    D)None of these
    Answer: 1.5
  • Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
    A)03 meter
    B)01 meter
    C)02 meter
    D)04 meter
    Answer: 01 meter
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
    A)30
    B)20
    C)10
    D)None of these
    Answer: 30
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
    A)8 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. ________ is measured with the help of anemometer.
    A)Both
    B)Wind
    C)Velocity
    D)None of these
    Answer: Both
  • Q. What is the speed of A class ODC in BG?
    A)40 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. Distant signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Permissive
  • Q. What was the main source of earning of Railway?
    A)Catering
    B)Goods fair
    C)Passenger fair
    D)None of thses
    Answer: Goods fair
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Indian Railway will publish new Magazine in all regional language. The name of that Magazine is:
    A)Rail Prakashan
    B)Rail Line
    C)Big Thing, Big Way
    D)Rail Bandhu
    Answer: Rail Bandhu
  • Q. “C” class ODC is run with the permission of ________.
    A)Head Quarter
    B)DOM
    C)CRS
    D)None of these
    Answer: CRS