Q. W/L board will be provided at not less than ________ metres from the gate.

Correct Answer

600

More Questions on Indian Railway

  • Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. Where is the wheel and axle plant of Indian Railways situated?
    A)Bangalore
    B)Chittranjan
    C)Kapurthala
    D)Perambur
    Answer: Bangalore
  • Q. In double Distant signalling, outermost signal is called as ________.
    A)Stop
    B)Distant
    C)Call-on
    D)None of these
    Answer: Distant
  • Q. “C” class ODC is run with the permission of ________.
    A)Head Quarter
    B)DOM
    C)CRS
    D)None of these
    Answer: CRS
  • Q. While protecting the material train, banner flag is placed at a distance of
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. Where there is no TSR, station master shall make entries in ________.
    A)Mid section
    B)Station diary
    C)Diary
    D)None of these
    Answer: Station diary
  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. Which of the following has been adjudged as the cleanest railway station in category A1, as per recently released report by the Ministry of Railways?
    A)Secunderabad
    B)Vishakhapatnam
    C)Jammu Tawi
    D)Anand ViharTerminal
    Answer: Vishakhapatnam
  • Q. The White light in point indicator indicates?
    A)Pass run through
    B)Loop line is set
    C)Main line set
    D)All is right
    Answer: Main line set
  • Q. Which whistle code shall be used by loco pilot while Approach on W board.
    A)Three short
    B)Long continue
    C)Intermittent
    D)Three long
    Answer: Intermittent
  • Q. While receiving train on an obstructed line and danger signal must be shown to LP at
    A)40 meters from obstruction
    B)45 meters
    C)30 meters
    D)None of these
    Answer: 45 meters
  • Q. passing through station during day when running without brakevan and tail board.
    A)25 kmph
    B)10 kmph
    C)20 kmph
    D)Normal speed
    Answer: 20 kmph
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
    A)Only 2 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 3
    Answer: Only 3
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. The turning out time off BD SPL. During day is ________ minutes
    A)50
    B)30
    C)20
    D)None of these
    Answer: 30
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3

Leave a Comment