Q. Train is to be passed through loop line.

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. To start a train from unsignalled line ________ authority is issued.
    A)T/511
    B)T/512
    C)T/515
    D)T/521
    Answer: T/511
  • Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
    A)Kochi
    B)Hyderabad
    C)Chennai
    D)Kolkata
    Answer: Hyderabad
  • Q. Which is the fastest train in India?
    A)Duronto Express
    B)Rajdhani Express
    C)Shatabdi Express
    D)Tejas Express
    Answer: E
  • Q. If the train passes through without headlight, SM shall give ________ bell code and advise the reason.
    A)0000-0
    B)000000-0
    C)00000-0
    D)0000-00
    Answer: 000000-0
  • Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
    A)Rajinder Sachar Committee
    B)Bibek Deberoy committee
    C)Rangarajan committee
    D)Mihir Shah Committee
    Answer: Bibek Deberoy committee
  • Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is
    A)Unrestricted
    B)75 kmph
    C)50 kmph
    D)None of these
    Answer: 75 kmph
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
    A)Only 1 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 1, 3 & 4
    Answer: Only 1
  • Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control,
    D)Unable to proceed, Guard protect the train in rear
    Answer: Unable to proceed, Guard protect the train in rear
  • Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. In which institution the training of electric work is being given?
    A)Railway Staff College
    B)Indian Railways Institute of Mechanical and Electrical Engineering
    C)Indian Railways Institute of Electrical Engineering
    D)Indian Railways Institute of Civil Engineering
    Answer: Indian Railways Institute of Electrical Engineering
  • Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
    A)White light left and right
    B)Green light up and down
    C)Green light left and right
    D)Green light without any movement
    Answer: Green light left and right
  • Q. Motor coach is a ________ coach.
    A)Self Minor
    B)Self Propelled
    C)Self System
    D)None of these
    Answer: Self Propelled
  • Q. BSLB determines the limits of Station section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A
  • Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
    A)Both
    B)PN
    C)Without PN
    D)None of these
    Answer: PN
  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. On which speed BG train should be run while speedometer failed in block section?
    A)No need to reduced speed
    B)10% less of sectional speed
    C)10% less of booked speed
    D)40 kmph
    Answer: 10% less of sectional speed
  • Q. When was the first train in India started?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853

Leave a Comment