Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.

Correct Answer

15/10 km/h

More Questions on Indian Railway

  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
    A)10 kmph
    B)5 kmph
    C)8 kmph
    D)None of these
    Answer: 5 kmph
  • Q. Motor Trolly can follow another motor trolly during
    A)Day and Night clear weather
    B)Day and Night
    C)Day only
    D)None of these
    Answer: Day and Night clear weather
  • Q. The speed of a Trolley is
    A)15 kmph
    B)20 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
    A)Rajinder Sachar Committee
    B)Bibek Deberoy committee
    C)Rangarajan committee
    D)Mihir Shah Committee
    Answer: Bibek Deberoy committee
  • Q. How many Class of Accident?
    A)20
    B)14
    C)16
    D)None of these
    Answer: 16
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. What is shunting order number?
    A)T-806
    B)T-609
    C)T/A-602
    D)T-409
    Answer: T-806
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
    A)Defective
    B)Caution
    C)Cautiously
    D)None of these
    Answer: Cautiously
  • Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
    A)3
    B)6
    C)4
    D)2
    Answer: 6
  • Q. Length of BOXN Wagon is
    A)10.71 meters
    B)8.67 meters
    C)9.78 meters
    D)None of these
    Answer: 10.71 meters
  • Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
    A)50 kmph
    B)15 kmph
    C)25 kmph
    D)75 kmph
    Answer: 15 kmph
  • Q. Where is the extreme north of India a railway station?
    A)Pathankot
    B)Jammu Tawi
    C)Baramulla
    D)Guwahati
    Answer: Baramulla
  • Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
    A)Automatic stop signal+180 Meters
    B)Next automatic stop signal
    C)Automatic stop signal+120 Meters
    D)None of these
    Answer: Next automatic stop signal
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
    A)Power
    B)Electrical & Diesel
    C)Diesel
    D)None of these
    Answer: Electrical & Diesel

Leave a Comment