Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.

Correct Answer

600

More Questions on Indian Railway

  • Q. Station working rules of an interlocked station is prepared by Sr. DOM and ________.
    A)Sr. DSTE
    B)DOM
    C)COM
    D)None of these
    Answer: Sr. DSTE
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. Which railway station entered Limca Book of Records 2018 for having all – women staff?
    A)Hazrat Nizamuddin railway station
    B)Chhatrapati Shivaji Terminus railway station
    C)Matunga railway station
    D)Kolkata railway station
    Answer: Matunga railway station
  • Q. At the starting station, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. In Material train, vehicles shall not be detached on gradient.
    A)1-400
    B)ST 1-260
    C)1-100 or steeper
    D)None of these
    Answer: 1-100 or steeper
  • Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
    A)T/369(B)
    B)T/369(3b)
    C)T/369(2b)
    D)None of these
    Answer: T/369(2b)
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. Motorman shall give ________ beat to release the hand brakes.
    A)00-00-00
    B)00-0-00
    C)0-0-0
    D)0-00-00
    Answer: 00-0-00
  • Q. Interchange point of Central and Western railway is ________.
    A)Both
    B)Dadar
    C)Jalgaon
    D)None of these
    Answer: Both
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. Maximum number of Explosive unit wagons in a goods
    A)3
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. Signal has extinguished.
    A)------00
    B)___0___
    C)0___0
    D)00___
    Answer: ------00
  • Q. In case of ACP, Assistant Loco Pilot shall proceed towards the rear from ________ side.
    A)Back
    B)Left
    C)Right
    D)Noe of these
    Answer: Right
  • Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
    A)Gujarat
    B)Kerala
    C)Tamil Nadu
    D)Andhra Pradesh
    Answer: Kerala
  • Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
    A)2 gangman
    B)JE(Pway)
    C)One gangman
    D)None of these
    Answer: JE(Pway)
  • Q. Where was the B.B.C.I locomotive started?
    A)Boriville
    B)Jamalpur
    C)Parel
    D)Hyderabad
    Answer: Parel
  • Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
    A)Central Reserve Police Force
    B)Assam Rifles
    C)National Security Guard
    D)Sashastra Seema Bal
    Answer: National Security Guard
  • Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
    A)Both
    B)PN
    C)Non-PN
    D)None of these
    Answer: PN
  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year