Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.

Correct Answer

T/409

More Questions on Indian Railway

  • Q. In case of 1 in 100 rising gradient, ________ siding is provided.
    A)Slip
    B)Long
    C)Catch
    D)None of these
    Answer: Slip
  • Q. When a stream engine is running tender foremost the speed shall not exceed ________.
    A)30 kmph
    B)40 kmph
    C)20 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
    A)Both are true
    B)Only 1 is true
    C)Only 2 is true
    D)Neither is true
    Answer: Both are true
  • Q. What will be the maximum speed of B-Class ODC in Broad guage?
    A)40 kmph
    B)15 kmph
    C)25 kmph
    D)75 kmph
    Answer: 40 kmph
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.7
    Answer: 4.7
  • Q. By whom the rear portion of train left behind in block section protected?
    A)By engineearing official
    B)By Guard
    C)By LP
    D)No need to protect the load
    Answer: By Guard
  • Q. SLB determines the limits of block section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. On which authority advance starter may be passed during shunting operation in its on position?
    A)On hand signal
    B)T-369(3b)
    C)Written memo
    D)T-806
    Answer: T-806
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. When a running line is occupied ________ entry must be made in TSR.
    A)Yellow Ink
    B)Red Ink
    C)Green Ink
    D)None of these
    Answer: Red Ink
  • Q. At what time the first train in India (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
    A)0-00
    B)00-00
    C)000-000
    D)None of these
    Answer: 00-00
  • Q. Hand shunting of wagons is totally prohibited in gradients
    A)1 in 260
    B)1 in 400 OR Steeper
    C)ST 1- IN 400
    D)None of these
    Answer: 1 in 400 OR Steeper
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. The Ministry of Railways has recently launched which app for freight managers?
    A)SNOORTI app
    B)SFOORTI app
    C)SKOORTI app
    D)SMOORTI app
    Answer: SFOORTI app
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second

Leave a Comment