Q. The zone with the minimum length is

Correct Answer

North - Eastern Frontier Railway

More Questions on Indian Railway

  • Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
    A)27 meters
    B)30 meters
    C)3 meters
    D)100 meters
    Answer: 30 meters
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. Termination indication board will be
    A)Rectangular
    B)Square
    C)Round
    D)None of these
    Answer: Round
  • Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
    A)Kochi
    B)Hyderabad
    C)Chennai
    D)Kolkata
    Answer: Hyderabad
  • Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
    A)Rail Madad
    B)Rail Sathi
    C)Rail Dost
    D)Rail Neer
    Answer: Rail Madad
  • Q. In Material train, vehicles shall not be detached on gradient.
    A)1-400
    B)ST 1-260
    C)1-100 or steeper
    D)None of these
    Answer: 1-100 or steeper
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Accident drill is ordered by DRM and is conducted under the supervision of ________
    A)DOM
    B)ADRM/Sr.DSO/DSO
    C)Sr.DOM
    D)None of these
    Answer: ADRM/Sr.DSO/DSO
  • Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
    A)40 kmph
    B)15 kmph
    C)30 kmph
    D)Normal
    Answer: 40 kmph
  • Q. Calling on signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Subsidiary
  • Q. Maximum No. of ________ coaches can be attached in rear of SLR of passenger train.
    A)4
    B)2
    C)3
    D)6
    Answer: 2
  • Q. Which is the India’s first double Decker train?
    A)Guwahati Thiruvananthapuram Express
    B)Ahmedabad - Mumbai Central Double Decker Express
    C)Samjhauta Express
    D)Howrah – Dhanbad Double Decker Express
    Answer: Howrah – Dhanbad Double Decker Express
  • Q. Special instructions are issued by ________.
    A)Both
    B)COM
    C)Sr. DOM
    D)None of these
    Answer: COM
  • Q. Record of caution order is kept for ________ months.
    A)9
    B)10
    C)5
    D)12
    Answer: 12
  • Q. Water over track is 90 mm.
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)25 kmph
    Answer: 10 kmph
  • Q. In the enroute, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. On double line, when a running line is blocked by stabled load , the point to be set against are
    A)Advance point
    B)Either side points
    C)Rear points
    D)None of these
    Answer: Rear points
  • Q. Which railway station has become the India’s first station to run by all women staff?
    A)Chhatrapati Shivaji Terminus railway station
    B)Matunga railway station
    C)Hazrat Nizamuddin railway station
    D)Kolkata railway station
    Answer: Matunga railway station
  • Q. Yearly goods stock census is taken on ________.
    A)30st November
    B)31st December
    C)31st October
    D)31st March
    Answer: 30st November
  • Q. What will be distance between fire affected train and rest of the train ?
    A)50 meters
    B)25 meters
    C)45 meters
    D)100 meters
    Answer: 45 meters

Leave a Comment