Q. The train has parted

Correct Answer

------0------0

More Questions on Indian Railway

  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. At A class station, Neutral zone is the portion between starter and ________ signal.
    A)Home signal
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. Who of the following is known for having designed the first railway timetables?
    A)George Bradshaw
    B)George Bradman
    C)George Bernard Shaw
    D)George Brummel
    Answer: George Bradshaw
  • Q. Colour of the semaphore repeating signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. In which Governor – General’s reign railway lines in India were established?
    A)Lord Kenning
    B)Lord William Bentick
    C)Lord Cornwallis
    D)Lord Dalhousie
    Answer: Lord Dalhousie
  • Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
    A)Shunt
    B)Repeating
    C)Call-on
    D)None of these
    Answer: Repeating
  • Q. Hand shunting of wagons is totally prohibited in gradients
    A)1 in 260
    B)1 in 400 OR Steeper
    C)ST 1- IN 400
    D)None of these
    Answer: 1 in 400 OR Steeper
  • Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
    A)Both
    B)UP
    C)Falling
    D)None of these
    Answer: UP
  • Q. During TFC in double line which authority to serve the driver for train operation?
    A)TC-602
    B)TC-1425
    C)TA-602
    D)TD-1425
    Answer: TC-602
  • Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
    A)1.5 Tonne
    B)2 Tonnes
    C)1 Tonne
    D)None of these
    Answer: 1 Tonne
  • Q. How many officers may be attached with light engine?
    A)1
    B)2
    C)3
    D)None of these
    Answer: 3
  • Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
    A)25 kmph
    B)50 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Shunting restrictions of station is written in ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: SWR
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. For work of long duration, the stop indicator must be erected at not less than
    A)40
    B)30
    C)50
    D)45
    Answer: 30
  • Q. Number of train signal register of single line is ________.
    A)T/166 B
    B)T/136 A
    C)T/137 B
    D)T/135
    Answer: T/137 B
  • Q. Maximum number of explosive unit wagons in a mixed train is
    A)3
    B)5
    C)7
    D)None of these
    Answer: 3
  • Q. The time limit for starting BD special during day is ________.
    A)30 meters
    B)20 meters
    C)15 meters
    D)40 meters
    Answer: 30 meters

Leave a Comment