More Questions on Indian Railway
- Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Trap indicator is provided to indicate ________.
A)Provision Switch
B)Indication Switch
C)Derailing switch
D)None of these
Answer: Derailing switch
- Q. Station limit is the portion between ________.
A)Both
B)Outermost signal
C)Innermost signal
D)None of these
Answer: Outermost signal
- Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
A)3
B)1
C)2
D)4
Answer: 3
- Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
A)Central India Railway
B)Bombay Baroda Railway
C)The Scindia Railway
D)Great Indian Peninsula Railway
Answer: Great Indian Peninsula Railway
- Q. The minimum distance from centre to centre of track in BG is
A)13 feet
B)14 feet
C)12 feet
D)None of these
Answer: 14 feet
- Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is
A)Unrestricted
B)75 kmph
C)50 kmph
D)None of these
Answer: 75 kmph
- Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 20 kmph
- Q. In case of ACP Guard shall proceed towards the front from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Left
- Q. The speed of shunting is ________.
A)10 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 15 kmph
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
A)43
B)41
C)42
D)45
Answer: 45
- Q. Caution order is carried forward at stations on Monday at ________ hours.
A)12:00
B)10:00
C)11:00
D)09:00
Answer: 09:00
- Q. When was the construction work for the first Railway line Started?
A)1823
B)1821
C)1828
D)1830
Answer: 1821
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph
- Q. Which authority shall be received to proceed for obstructed block section due to an Accident?
A)T/A 602
B)T-1425
C)T-369(3b)+P.No.
D)Simple memo
Answer: T/A 602
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway