Q. The speed of Motor Trolly over points and crossings is
A
15 kmph
B
10 kmph
C
8 kmph
D
None of these
Correct Answer
15 kmph
More Questions on Indian Railway
Q. When was the first train steamed off in India?
A)1875 B)1848 C)1853 D)1880
Answer: 1853
Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm B)60 mm C)70 mm D)50 mm
Answer: 50 mm
Q. Validity of the competency certificate of the gateman is for ________ years.
A)9 B)10 C)3 D)4
Answer: 3
Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
A)10 B)15 C)20 D)25
Answer: 10
Q. Cotton in closed wagon shall be attached ________ position from engine on a goods train.
A)Third B)First C)Second D)None of these
Answer: Second
Q. Corridor block is mentioned in the ________.
A)SOR B)SWR C)WTT D)None of these
Answer: WTT
Q. Consider the following statements about Railway Convention Committee: 1)The Chairman of the Committee is appointed by the Speaker from amongst the members of the Committee 2) The Committee reviews the rate of dividend which is payable by the Railway Undertaking to the General Revenues Which of the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: Both 1 & 2
Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
A)15 km B)8 km C)10 km D)20 km
Answer: 15 km
Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
A)1, 2 & 3 B)1 & 2 Only C)2 & 3 Only D)None
Answer: 1, 2 & 3
Q. During Thick or Foggy weather, 2 Detonators must be placed in rear of Engineering indicator at
A)400 meters B)270 meters C)90 meters D)None of these
Answer: 90 meters
Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3 B)1 C)2 D)4
Answer: 2
Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
A)35 B)20 C)25 D)30
Answer: 30
Q. Mountain Railways of India refer to the railway lines built in the mountains of India in the nineteenth and early twentieth century, during the British Raj, even being run today by the Indian Railways. How many railway lines refer to the Mountain Railways of India ?
A)5 B)3 C)4 D)6
Answer: 3
Q. When was the nationalization of Indian Railways done?
A)1951 B)1952 C)1950 D)1954
Answer: 1950
Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1) B)T-509 C)T-369(3b) D)Simple memo
Answer: T-369(1)
Q. Maximum No. of ________ track machines can be sent for working in a block section.
A)25 B)20 C)15 D)30
Answer: 25
Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?