- Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3
B)1 2 3 4
C)1 2 4 3
D)3 1 4 2
Answer: 4 2 1 3
- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. Tower wagon shall run as per the rules of working of ________.
A)Passengers
B)Wagon
C)Train
D)None of these
Answer: Train
- Q. Between which of the destinations the first Indian train was started?
A)From Mumbai to Surat
B)From Kolkata to Delhi
C)From Mumbai to Thane
D)From Mumbai to Madras
Answer: From Mumbai to Thane
- Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
A)540
B)900
C)580
D)570
Answer: 580
- Q. By whom the rear portion of train left behind in block section protected?
A)By engineearing official
B)By Guard
C)By LP
D)No need to protect the load
Answer: By Guard
- Q. If there is no advanced starter at A’ class station, signal overlap will be ________.
A)Block sectiond
B)Next whole block section
C)Back whole block section
D)None of these
Answer: Next whole block section
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. For disconnection of points S&T official must issue form ________
A)T/B 351
B)T/351
C)T/A 351
D)None of these
Answer: T/351
- Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third
B)First
C)Second
D)Fourth
Answer: Fourth
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Nil Caution order number is ________
A)T/C409
B)T/A-409
C)T/B-409
D)None of these
Answer: T/A-409
- Q. Hand shunting is performed at speed not exceeding
A)05 kmph
B)10 kmph
C)08 kmph
D)None of these
Answer: 05 kmph
- Q. Moped trolley / Scooter trolley treated as ________.
A)Motor Trolley
B)Push Trollies
C)Trolley
D)None of these
Answer: Motor Trolley
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. Point indicator is provided to indicate ________.
A)Both
B)Points
C)Bar
D)None of these
Answer: Points
- Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective
B)Restricted
C)Most restricted
D)Noe of these
Answer: Most restricted