Q. The Rangpo – Sivok Railway line, connects which among the following two states of India?

Correct Answer

Sikkim ↔ West Bengal

More Questions on Indian Railway

  • Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
    A)85
    B)60
    C)75
    D)90
    Answer: 90
  • Q. Your train is first during TSL on double line.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. Calling on signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Subsidiary
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. During TFC in single line section what authority to proceed will be served to driver of Dn train during return.
    A)TH-602
    B)T/A-602
    C)TG-602
    D)TB-602
    Answer: TH-602
  • Q. How many minimum BP pressure is require in engine to charge Goods train?
    A)5.8 kg/cm2 D. 5.00 kg/cm2
    B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
    D)5.00 kg/cm2
    Answer: 5.00 kg/cm2
  • Q. Block overlap in multiple aspect signalling system is ________ meters.
    A)180
    B)200
    C)300
    D)208
    Answer: 180
  • Q. In double Distant signalling, outermost signal is called as ________.
    A)Stop
    B)Distant
    C)Call-on
    D)None of these
    Answer: Distant
  • Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
    A)ALP
    B)Driver
    C)Guard
    D)None of these
    Answer: Guard
  • Q. Is general manager responsible for?
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. Each motor coach shall consist of ________ Traction motors.
    A)4
    B)2
    C)3
    D)5
    Answer: 4
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. There are 8 appendices and ________ parts in SWR.
    A)10
    B)8
    C)4
    D)12
    Answer: 12
  • Q. The validity of BCC is for ________ years
    A)01 years
    B)03 years
    C)02 years
    D)None of these
    Answer: 03 years
  • Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
    A)Both
    B)Off
    C)On
    D)None of these
    Answer: On
  • Q. During emergency, in the absence of tail board ________ can be used with the DRM.
    A)Yellow flag
    B)GREAN FLAG
    C)RED FLAG
    D)None of these
    Answer: RED FLAG
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. What will be the speed of a train running through from station without brake van provoded with Tail lamp?
    A)15 kmph
    B)20 kmph
    C)Stop & Start
    D)Normal speed
    Answer: Normal speed

Leave a Comment