Q. Maximum speed of pushing back is ________ km/h.
A)45 B)30 C)25 D)40
Answer: 25
Q. Maximum No. of ________ track machines can be sent for working in a block section.
A)25 B)20 C)15 D)30
Answer: 25
Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10 B)7 C)9 D)15
Answer: 7
Q. A station where the rail lines end, is called
A)Block station B)Junction station C)Way - side station D)Terminal station
Answer: Terminal station
Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
A)5 B)15 C)20 D)None of these
Answer: 15
Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
A)Gate opened and point is not set for main line B)Gate closed and point is set for main line C)Gate opened and point is set for main line D)Defective signal
Answer: Defective signal
Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km B)4300 Km C)3700 Km D)5298 km
Answer: 3700 Km
Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi B)Hyderabad C)Chennai D)Kolkata
Answer: Hyderabad
Q. Goods warning board will be provided from FSS in BG at
A)560 meters B)1400 meters C)1000 meters D)None of these
Answer: 1400 meters
Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5 B)10 C)20 D)None of these
Answer: 10
Q. In how many zones Indian Railway has been divided?
A)17 B)14 C)16 D)20
Answer: 17
Q. Signal passed at danger is treated as ________ accident.
A)Indirection B)Indicative C)Direct D)None of these
Answer: Indicative
Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
A)T/104C B)T/105B C)T/106B D)T/102B
Answer: T/102B
Q. Where is the Research, Design and Standard Organization situated?
A)Pune B)Lucknow C)Bangalore D)New Delhi
Answer: Lucknow
Q. When was the Central Railway established?
A)14th April 1951 B)5th Nov 1951 C)14th Nov 1951 D)16th August, 1951
Answer: 5th Nov 1951
Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25 B)20 C)15 D)30
Answer: 25
Q. When the section is occupied, the arrow indication in the panel in Twin single line working will be