Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.

Correct Answer

1 - 98 meters

More Questions on Indian Railway

  • Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
    A)T/A 602
    B)T-806
    C)T/A 802
    D)T-806 A
    Answer: T-806
  • Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
    A)80
    B)70
    C)75
    D)85
    Answer: 75
  • Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
    A)Power
    B)Electrical & Diesel
    C)Diesel
    D)None of these
    Answer: Electrical & Diesel
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. What is the length of North-Eastern Frontier Railway (NFR)?
    A)4290 km
    B)4300 km
    C)3700 km
    D)5298 km
    Answer: 3700 km
  • Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
    A)15 kmph
    B)30 kmph
    C)25 kmph
    D)Normal speed
    Answer: 25 kmph
  • Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
    A)Block instrument
    B)Signal over lap
    C)Over lap
    D)None of these
    Answer: Signal over lap
  • Q. Train is to be passed through loop line.
    A)30 kmph
    B)15 kmph
    C)25 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Capacity of a slip siding is ________
    A)06 or 07 wagon
    B)03 or 04 wagon
    C)04 or 05 wagon
    D)None of these
    Answer: 03 or 04 wagon
  • Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
    A)T/606
    B)T/605
    C)T/606
    D)T/609
    Answer: T/609
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. ________ bogies can be attached in rear of SLR of Mail/Express train.
    A)2
    B)4
    C)3
    D)8
    Answer: 2
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
    A)Received train
    B)Train Divided
    C)Thorugh train
    D)None of these
    Answer: Train Divided
  • Q. New Humsafar Express, 3 – tier AC train was flagged off between which two locations on 2 June 2018?
    A)Agartala and Bengaluru
    B)Ajmer and Rameshwaram
    C)Gorakhpur and Anand Vihar
    D)Jodhpur and Bandra
    Answer: Jodhpur and Bandra
  • Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
    A)One short
    B)Two short
    C)Three short
    D)Noen of these
    Answer: Two short
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
    A)145
    B)45
    C)90
    D)150
    Answer: 45
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. When was the first underground railway (Metro Railway) started?
    A)1984
    B)1982
    C)1989
    D)1992
    Answer: 1984

Leave a Comment