Q. The form number of authority to proceed without line clear is ________.

Correct Answer

T/1408

More Questions on Indian Railway

  • Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
    A)25
    B)20
    C)15
    D)None of these
    Answer: 25
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 15 kmph
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the brake van.
    A)6.8
    B)7.8
    C)5.8
    D)4.8
    Answer: 4.8
  • Q. Used for A self propelled vehicle repairs in OHE is
    A)Moped Trolley
    B)Tower wagon
    C)Ladder Trolley
    D)None of these
    Answer: Tower wagon
  • Q. When was the first underground railway (Metro Railway) started?
    A)1984
    B)1982
    C)1989
    D)1992
    Answer: 1984
  • Q. New Humsafar Express, 3 – tier AC train was flagged off between which two locations on 2 June 2018?
    A)Agartala and Bengaluru
    B)Ajmer and Rameshwaram
    C)Gorakhpur and Anand Vihar
    D)Jodhpur and Bandra
    Answer: Jodhpur and Bandra
  • Q. Number of the Nil caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 408
    D)None of these
    Answer: T/A 409
  • Q. Between which place station section is situated at double class B station, equipped with MACLS?
    A)FP to LSS
    B)Home signal to Ad starter
    C)BSLB to Ad. Starter
    D)A or B any one
    Answer: BSLB to Ad. Starter
  • Q. Maximum speed of pushing back is ________ km/h.
    A)45
    B)30
    C)25
    D)40
    Answer: 25
  • Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. Standard time is set at all station every day ________ Hours
    A)16
    B)10
    C)15
    D)None of these
    Answer: 16
  • Q. What is the maximum speed in block section during thick & foggy weather?
    A)15 kmph
    B)30 kmph
    C)60 kmph
    D)Not to move
    Answer: 60 kmph
  • Q. Patrolman becoming overdue during night.
    A)40 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 10 kmph
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Special instructions are issued by ________.
    A)Both
    B)COM
    C)Sr. DOM
    D)None of these
    Answer: COM
  • Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
    A)8
    B)3
    C)5
    D)10
    Answer: 3