Q. The extended life of Detonator is ________ Years.

Correct Answer

10

More Questions on Indian Railway

  • Q. Water over track is 90 mm.
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)25 kmph
    Answer: 10 kmph
  • Q. The turning out time off BD SPL. During day is ________ minutes
    A)50
    B)30
    C)20
    D)None of these
    Answer: 30
  • Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
    A)1000 meters
    B)400 meters
    C)600 meters
    D)None of these
    Answer: 600 meters
  • Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
    A)40/15 kmph
    B)60/30 kmph
    C)35/20 kmph
    D)Normal speed
    Answer: 35/20 kmph
  • Q. Which state has the longest route (in kilometers) of railway line in India?
    A)Rajasthan
    B)Maharashtra
    C)Andhra Pradesh
    D)Uttar Pradesh
    Answer: Uttar Pradesh
  • Q. On which authority relief train shall be dispatched for obstructed block section?
    A)On memo
    B)PLCT
    C)T/A602
    D)None of these
    Answer: T/A602
  • Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
    A)Sutlej
    B)Chenab
    C)Jhelum
    D)Indus
    Answer: Chenab
  • Q. Signal sighting committee consists of TI, SI/PWI and ________.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. What will be distance between fire affected train and rest of the train ?
    A)50 meters
    B)25 meters
    C)45 meters
    D)100 meters
    Answer: 45 meters
  • Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
    A)30 kmph
    B)Normal speed
    C)15 kmph
    D)60 kmph
    Answer: 60 kmph
  • Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
    A)Assam and Maharashtra
    B)Manipur and Jammu & Kashmir
    C)Jammu & Kashmir & Assam
    D)Maharashtra and Jammu & Kashmir
    Answer: Manipur and Jammu & Kashmir
  • Q. Which road suburban railway station in Mumbai has been rechristened as Prabhadevi station?
    A)Churchgate
    B)Boisar
    C)Andheri
    D)Elphinstone
    Answer: Elphinstone
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. On which of the following is the longest railway bridge in India located?
    A)River Brahmaputra
    B)River Ganges
    C)Vembanad Lake
    D)Chilka Lake
    Answer: River Brahmaputra
  • Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
    A)139
    B)144
    C)123
    D)119
    Answer: 139
  • Q. What is the length of North-Eastern Frontier Railway (NFR)?
    A)4290 km
    B)4300 km
    C)3700 km
    D)5298 km
    Answer: 3700 km
  • Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
    A)Walkie-Talkie
    B)Walkie
    C)VHF
    D)None of these
    Answer: Walkie-Talkie
  • Q. W/L board will be provided at not less than ________ metres from the gate.
    A)600
    B)400
    C)500
    D)800
    Answer: 600
  • Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
    A)LI
    B)TI
    C)CI
    D)None of these
    Answer: TI